THE LATEST INDUSTRY NEWS FROM PEAK ASSOCIATES

November 21, 2017

Flood Risk Assessment and Culvert Design

Following the completion of a Flood Risk Assessment (FRA) and liaison with the local planning authority for a site in Salford, Peak Associates have completed a design for a culvert of a stream on the site to facilitate the development of two residential buildings.
November 21, 2017

Permit Variation at Smolt Farm

Peak Associates have been working for an aquaculture operator in rural Cumbria since 2010. The operator produces salmon smolt for maturing at their sea lochs in Shetland. The multinational brings £4 million to the UK economy each year.
November 21, 2017

Sustainable Drainage Scheme (SuDS) at Guide Campsite

Peak Associates have recently assisted in the design for a new building at a Guide campsite.
November 21, 2017

50% of SMEs Are Failing To Comply With Waste Regulations: Are You One of Them?

According to a recent Environmental Services Association (ESA) survey, 48% of the businesses in the agricultural, construction and retail sectors surveyed did not know where all their waste goes when it leaves site, and more than a third admitted to not being sure if they had completed waste transfer notes.
November 21, 2017

Metal Recycling Facility – Site Auditing And Drainage Checks

Peak Associates has been working for a metal recycling company with sites in Yorkshire and Tyne & Wear. We have completed a series of environmental audits in the run up to submitting applications to the EA for permit variations.